Choosing a Cleaning Company in Leeds: 9 Questions That Expose a Bad Quote

Don’t compare monthly prices. Compare hours, hourly rate, supervision and cover. The nine questions below will show you within ten minutes which quotes were built properly and which were guessed.
Most cleaning contracts that fail do it in the first three months. It’s rarely bad luck. The warning signs were in the quote. Ask every shortlisted supplier these questions and write down the answers.
The nine questions
Did you survey the site?
A quote done over the phone is a guess. You want a walk-round, a written specification and a named contact.
How many hours am I buying?
If two quotes are far apart, the hours usually explain it (here’s what goes into the price). Ask for hours per night, per week.
What do your cleaners earn?
Low pay means high turnover, and high turnover means a stranger in your building every few weeks.
Who checks the work, and how often?
Ask about scheduled audits, scores and who reads them. “Our supervisor pops in” isn’t a system.
What happens when my cleaner is off?
Holidays and sickness are certain. Find out who covers, how quickly, and whether the cover cleaner has seen the site before.
Can I see your RAMS and COSHH sheets?
Risk assessments, method statements and COSHH chemical data sheets are basic legal compliance. They should exist before day one.
What insurance do you hold?
Employers’ liability is a legal requirement (at least £5m). Ask for public liability too, and get the certificates.
How do you vet staff and look after keys?
Out-of-hours access means trust. Ask about references, right-to-work checks, key logs and alarm codes. Ask about BS 7858 screening if your site is secure.
What do the first 30 days look like?
Good suppliers plan the start: induction, a deep clean, a check-in at week one and a review at day 30.
of Real Living Wage employers say paying it has improved their recruitment. That matters to you because the cleaner who stays is the one who knows your building.
Score the quotes side by side
Score each question from 0 to 2 and add them up. Here’s a typical outcome. The cheapest quote is rarely the best value.
Use one card per supplier. Fill it in during the site visit, not afterwards.
| Question | Score (0–2) |
|---|---|
| 1. Site surveyed? | ●● |
| 2. Hours stated? | ●● |
| 3. Cleaners’ pay | ●● |
| 4. Who checks the work | ●● |
| 5. Cover arrangements | ●● |
| 6. RAMS and COSHH | ●● |
| 7. Insurance certificates | ●● |
| 8. Vetting and keys | ●● |
| 9. First 30 days plan | ●● |
Red flags and what good looks like
| Red flag | What good looks like |
|---|---|
| A price before anyone has seen the building | A site survey, then a written specification |
| “All-inclusive” with no hours stated | Hours per night and per week, in writing |
| No named account manager, just a call centre | One named contact who has walked your site |
| Hesitation when you ask what the cleaners are paid | A straight answer, ideally the Real Living Wage |
| Paperwork “to follow” | RAMS, COSHH sheets and insurance certificates sent with the quote |
| Auto-renewal with a long notice window | A clear term and a fair way out (more on contract terms) |

What “local” should mean in Leeds
Every supplier says it’s local. Test it. How far away is the nearest cover cleaner? Has the supervisor worked in buildings with managed reception, timed loading bays or out-of-hours security, as most of the city centre has? Can they be on site tomorrow morning if something goes wrong overnight? A Leeds postcode on the letterhead doesn’t answer any of those. It’s the standard we hold our own office cleaning across Leeds to.
Specialist cleaner or facilities provider?
If cleaning is all you need, a specialist is fine. If you also deal with window cleaning, washroom services, minor repairs and grounds, one facilities supplier with one contact and one invoice can save management time. Just check that the cleaning isn’t an afterthought in a bigger bundle.
Questions we get asked
How many quotes should I get?
Three is enough. More than that and you spend longer comparing than you’ll ever save.
Should I go with a national or a local firm?
National firms bring systems. Local firms bring speed and continuity. Use questions 4, 5 and 9 to tell you which one you’re actually talking to.
How long should a first contract be?
Twelve months with a clear performance exit is sensible. Avoid long terms with no break clause.
We’ll answer all nine in writing with the quote. That’s the standard we’d want if we were buying.
Request a site survey